Fee for a contractor?
  • rogue63
    Posts: 410
    What percentage should a contractor get? I mean, I asked the local brass professor to take care of hiring for Easter brass players for me, and I figured he should get a fee for doing the extra work. Thoughts?
  • Most here ask for 10% of the total stipends paid to the instrumentalists.
    Thanked by 1BruceL
  • jpal
    Posts: 365
    I know three contractors, and they all charge a flat $25 per person hired.
  • chonakchonak
    Posts: 9,220
    In some situations, a contractor is paid the rate of one performer; for a small event, that might be out of proportion.

  • rogue63
    Posts: 410
    This is about what I was thinking---thanks!
  • PaixGioiaAmorPaixGioiaAmor
    Posts: 1,473
    Here they get nothing just for that; they are usually one of the instrumentalists to be hired, so they get that, but the gig is contingent on them finding three other people to play with.
  • Kathy
    Posts: 5,513
    Sometimes these things are handled less formally, on a favors system. Asking a musician to do a gig is like handing him/her cash, so the contractor is sort of owed a favor by everybody, which can either be evened out with a stipend or just informally banked, so to speak.
    Thanked by 1CHGiffen
  • PaixGioiaAmorPaixGioiaAmor
    Posts: 1,473
    Yes, that, or they may have a paternal interest, such as in the case of a teacher for a studio who wants to help their students get jobs.
    Thanked by 1BruceL